Mobile
Log In Sign Up
Home > english-chinese > "load displacement" in Chinese

Chinese translation for "load displacement"

【航海】满载排水量。


Related Translations:
displacement:  n.1.转位,移动;取代,置换;(人的)流离失所。2.撤换,免职。3.【机械工程】(活塞)排气量;【航海】排水量〔一般指军舰的排水量;商船的排水量一般用 gross [net] ton(nage)〕。4.【化学】置换(作用),取代(作用);【物理学】位移;【医学】移位;【生物学】替位;【药学】滤过;【地质学;地理学】(断层)移动。短语和例子displacement nitr
cubic displacement:  【造船】排水量[吨位]。
displacement stress:  【物理学】位移应力。
virtual displacement:  [work] 【物理学】虚位移[功]。
surface displacement:  【航海】(水上)排水量。
displacement tonnage:  排水吨数。
Example Sentences:
1.Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties couplet test
圬工辅助砌块的试验方法.墙拉杆的拉伸和压缩负载容量和负载转移特性的测定
2.Methods of test for ancillary components for masonry - determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test
圬工辅助砌块的试验方法.墙拉杆的拉伸和压缩负载容量和负载转移特性的测定
3.Methods of test for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couple test
圬工辅助成份试验方法.第5部分:拉伸和压缩负载容量和墙系柱和负载代替特性测定
4.Methods of test for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test
圬工辅助成份试验方法.第5部分:拉伸和压缩负载容量和墙系柱和负载代替特性测定
5.Methods of tests for ancillary components for masonry - part 5 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties couplet test ; german version en 846 - 5 : 2000
砖石工程辅助元部件试验方法.第5部分:墙拉杆抗拉荷载
6.Methods of tests for ancillary components for masonry - part 6 : determination of tensile and compressive load capacity and load displacement characteristics of wall ties single end test ; german version en 846 - 6 : 2000
砖石工程辅助元部件试验方法.第6部分:墙拉杆抗拉荷载
7.Methods of test for ancillary components for masonry - determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connection
圬工辅助砌块的试验方法.剪切杆和滑动杆的拉伸和压缩负载容量和负载转移特性的测定
8.Methods of test for ancillary components for masonry - part 7 : determination of shear load capacity and load displacement characteristics of shear ties and slip ties couplet test for mortar joint connections
圬工辅助成份试验方法.第7部分:拉伸和压缩负载容量和墙系柱和负载代替特性测定
9.The load displacement curves and the ultimate strength of each member are presented . effects of beam length , radius of curvature and flexural - torsional rigidity on ultimate are considered
通过试验研究,给出每个构件的荷载位移曲线和极限承载力,得到了曲梁承载力随跨长、曲率半径以及截面尺寸的变化规律。
10.With the mechanics simulation of temperature load and time independent , it is on time made to monitor the corresponding load displacement field and the change tendency at any time , and is monitored the dam work regularity
并对温度和时效进行力学的模拟,使其及时监测在任何时刻所对应荷载的位移场和变化趋势,从而监控大坝的运行性态及规律。
Similar Words:
"load dispatch" Chinese translation, "load dispatch center" Chinese translation, "load dispatcher" Chinese translation, "load dispatching board" Chinese translation, "load dispatching office" Chinese translation, "load distance" Chinese translation, "load distance rate" Chinese translation, "load distribution" Chinese translation, "load distribution bus" Chinese translation, "load distribution curve" Chinese translation